Reference
Glossary
Every term the guide uses. Where the specification uses a different word, it is shown in brackets. The chapter on sources says where each term comes from.
- Adapter[door]
- The code through which one kind of side effect reaches the outside world, such as a payout or an email. Together the adapters form the imperative shell. Read more →
- Agent review
- The review every milestone and every piece of unplanned work gets from the reviewer agent, whether or not a person reviews as well. Read more →
- AGENTS.md
- The first file an agent reads in a repository. Its top part is specific to the repository; its appendix summarizes CanonBall. Read more →
- Agreement gate[Gate 1]
- The end of the Shape station: a person agrees to a change proposal and approves its examples. Always required when a change adds or alters a clause. Read more →
- Assembly
- The one file that says which unit fills each role. Read more →
- Assumption
- A fact about the outside world a clause relies on, with a plan for watching it and for what happens when it fails. Read more →
- Assurance case[case]
- For one clause: the parts it splits into, the environment that checks each part, and the argument that the parts are enough. The term comes from safety engineering. Read more →
- Assurance policy
- Rules, owned by people, that turn evidence into a status and say when a person must accept a release. No agent may write them. Read more →
- Back pressure
- The upkeep a running system demands: incidents, bugs and reliability problems that come back as work. Read more →
- Blast radius
- How much can break if a change is wrong: which clauses, which customers, and whether it can be undone. Read more →
- Blueprint
- The agents’ design for keeping the canon: architecture, one assurance case per clause, and the verification plan. Read more →
- Builder
- The agent that writes the code. It can run the checks and cannot change them. Read more →
- Canon
- The set of clauses people have approved. It describes what the system promises today. Read more →
- CanonBall
- The method. Also one release of a system: the canon, the build and the Verification Record, fixed together. Read more →
- Change proposal[change.md]
- One page that answers "what changes in the system?", with the clauses it adds and why now. Read more →
- Check
- An automated test that encodes one example and decides pass or fail from what it observes. Read more →
- Clause
- One statement in the canon: a file with an ID, a kind and its examples. Promises, invariants, decisions, constraints and assumptions are all clauses. Read more →
- Constraint[envelope]
- What is never allowed, whatever the goal. It has its own owner, with a veto. Safety engineering calls these safety constraints. Read more →
- Content hash[digest]
- A short value computed from the contents of some files. When the files change, the hash changes, and evidence that relied on them is stale. Read more →
- Contract tests[conformance suite]
- The tests any provider of a role must pass. Read more →
- Decision
- A choice that could have gone another way, written down so it is not silently made again. Read more →
- Decision log
- A record the running system writes for each decision: the clause it applied, the inputs it used and the result. Read more →
- Decision logic[pure core]
- Code that decides what should happen from explicit inputs, with no side effects. Also called the functional core. Read more →
- Elicitor
- The agent that drafts clauses and change proposals from conversations, and files questions when something is ambiguous. Read more →
- Escaped defect[escape]
- A problem that passed every gate and reached production. Read more →
- Evidence
- The recorded result of one check run: what was checked, against which code, in which environment, with what outcome. Read more →
- Example[story]
- One worked case of a clause, written as given, when, then. Examples are what people approve. Behavior-driven development calls it a scenario. Read more →
- Express belt
- The path for unplanned work: repairs and upkeep that change no promise. It skips the batching into a milestone and none of the stations. Read more →
- Fake
- A working stand-in for an outside dependency, such as a payment gateway that runs in memory. One kind of test double. Read more →
- Forward pressure
- People pushing new requests into the system. Read more →
- Held-out scenarios[holdout]
- Scenarios that people write and keep where neither the builder nor the verifier can read them. Read more →
- Holdout keeper
- The agent that runs the held-out scenarios, which people write, and reports only pass or fail. Read more →
- Incident
- A failure in production. It is diagnosed, repaired on the express belt, and leaves an example behind. Read more →
- Injected fault[seeded fault]
- A small deliberate defect, applied to a scratch copy, used to show that a check can fail. Mutation testing calls it a mutant. Read more →
- Invariant
- What must always be true for the system to be correct. Read more →
- Level of automation[autonomy level]
- How far one kind of decision has been handed to agents, from "agent analyzes" to "agent acts, people watch the metrics". Read more →
- Milestone
- A batch of related requests shaped and built together: one change proposal, the files it proposes, and the tasks to build it. The unit in which work moves. Read more →
- Monitor
- A check that runs in production and watches an assumption or an invariant. When it fires, an incident opens. Read more →
- Observability
- How much of a system’s inner state can be read from outside it. Here, the signals a system emits and the tools agents use to read them. Read more →
- On-call agent
- The agent that watches the monitors, diagnoses incidents with the observability tools, and drafts the repair. A person decides anything risky. Read more →
- Oracle
- Whatever decides whether an observed result is correct. A mechanical check is the preferred kind. Read more →
- Orchestrator
- A program, not an agent. It computes the state of every milestone and task from what exists in the repository, compares predicted with actual behavior, and performs the release. Read more →
- Planner
- The agent that writes the blueprint: the design, the assurance cases, and the predicted change in behavior. Read more →
- Predicted change in behavior
- A statement, written at Shape, of how the system’s behavior will differ after a milestone. At Review it is compared with what actually changed. Read more →
- Promise[requirement]
- What the system does for someone. Read more →
- Recorded failure[red proof]
- The kept output of a run in which a check failed against an injected fault. It shows the check can fail. Read more →
- Release
- The only event that changes spec/. It copies in a change’s proposed files and publishes a CanonBall. Read more →
- Release candidate[candidate present]
- spec/ with one change’s proposed files applied. Checks for that change run against it. Read more →
- Release gate[Gate 2]
- At the Review station, a person accepts the remaining risk of a release. Required only when the policy says the change is critical. Read more →
- Release rule
- A milestone may be released when every clause it touches is accepted and no other clause got worse. Read more →
- Request
- Anything someone asks of the system before it has been shaped: a complaint, a number, an idea. Related requests gather into a milestone. Read more →
- Reviewer
- The agent that reviews every change against its clauses and the Verification Record. It writes nothing but its review. Read more →
- Role
- A contract one unit defines for something it needs another to provide, published with contract tests and a fake. Read more →
- Station
- One of the seven stops a milestone passes: Collect, Shape, Build, Verify, Review, Release, Operate. Read more →
- System under test[boundary]
- The part of the system a verification environment exercises. Read more →
- Tenet
- A statement of which good thing wins when two conflict, written as X over Y. Agents cite tenets when they recommend. Not a clause. Read more →
- Tier
- How critical a clause is, from 0 to 2. It sets how much argument its assurance case needs and whether a person reviews it. Read more →
- Trace
- The record of one request’s path through the system, under one ID. Read more →
- Unit
- A separately owned part of a system with its own canon, build and Verification Record. A service, a subdomain and a domain are all units. Read more →
- Unplanned work
- An incident repair, a bug fix, a refactoring or other upkeep: work that restores a promise or changes none. It has a small change proposal, rides the express belt, and is released on its own. Read more →
- Verification engineering
- The work of building environments and checks that can show a clause holds, and can show it failing. Read more →
- Verification environment
- A designed place to produce evidence, with seven parts and a statement of what it cannot show. Read more →
- Verification level
- What a part of a clause depends on, from pure logic (0) to physics and people (4). It decides the method. Read more →
- Verification Record[Record]
- The status of every clause, computed from evidence. It is published, and nobody edits it. The guide shortens it to "the Record" after first use. Read more →
- Verifier
- The agent that builds environments, checks and monitors. It cannot change the code it judges. Read more →
- Vocabulary[glossary]
- The file that defines each noun the team uses, once. Domain-driven design calls the result a ubiquitous language. Read more →