Guide / One milestone, station by station
Operate: run it, and feed what breaks back in
The running system is watched and diagnosed by an agent with tools to see inside it, and what breaks returns to the belt as work.
- Who
- Agent: On-call agentPerson: Operator
- Reads
observe/verify/monitors/- Writes
incidents/roadmap/unplanned/- In the repo
- See the incident 75ac2f0…0d1173cSee the repair, released as CanonBall 14 0d1173c…c62fe85
What arrives
CanonBall 13 is running, with monitors on the assumptions the evidence rested on. The refunds service assumes the payment gateway pays at most once per request key (ASM-011). No test can prove that about someone else’s system, so a monitor watches for it in production. The on-call agent watches the monitors, the error rates and the support queue.
Back pressure
A running system asks for upkeep. Customers find cases nobody wrote an example for, dependencies change, and load grows. This is back pressure: work that arrives from the system itself, on its own schedule. It travels on the same belt as planned work, because a repair that skips verification is a common cause of the next incident.
A refusal on day 29
Three weeks after the release, a customer writes to support. Their refund for order 5512, requested on 2 April, was refused as too late, and they are sure they asked within 30 days. No monitor fired, because none watches refusals.
The on-call agent opens incident INC-007 and asks the system what it decided for that order.
$ observe/tools/observe decisions --order 5512
REQ-012 refund window
result refused
reason day 31 of 30
counted from dispatch, 2 March
delivered 4 March
The window was counted from the day the order was dispatched. The vocabulary says delivery means the carrier’s delivered scan, so one part of the code had read the wrong date.
The cause was read from the decision log. Without the log, the agent would have had a refused refund, a date, and a long list of things that might be wrong.
The incident also records that REQ-012 showed as accepted the whole time. Its checks passed because none of them used an order whose dispatch and delivery dates differed. Accepted means supported by the evidence so far, and that evidence had a gap.
The person’s part
Paying this customer now is money moving outside the normal path, so the operator approves it. The repair adds an example and an invariant, and both need a person’s approval like any other.
The repair takes the express belt
The fix restores what was already promised, so it does not wait for a milestone. It gets a small folder, roadmap/unplanned/inc-007-window-from-delivery/, and passes the same stations.
| Station | What happens |
|---|---|
| Shape | The failing case becomes an example. An invariant is proposed to pin down what REQ-012 already says: INV-009, the refund window is counted from delivery, never from dispatch. The product manager approves both. |
| Build | The builder corrects one line, window_start in src/refunds/decide.py, to read the day of delivery. |
| Verify | The verifier adds late delivery to the starting states VE-002 declares, writes three checks, for the new REQ-012 example and both INV-009 examples, and sees each fail against verify/faults/count-from-dispatch.patch, which puts the defect back. |
| Review | The reviewer agent reviews it. It decides who is paid, so the refunds owner looks too. |
| Release | CanonBall 14, released on 6 April 2026: 5 accepted, 1 accepted, with stated risk. |
What the system keeps
The incident is filed in incidents/ and stays there.
# INC-007 Refund refused on day 29
Detected: a support report. The customer of order 5512 asked for a refund on 2 April 2026, 29 days after
delivery, and was refused as too late. No monitor fired: none watches refusals.
Diagnosis: the on-call agent read the decision log for the order (below). The REQ-012 decision was
"day 31 of 30", counted from dispatch on 2 March 2026. Delivery was 4 March 2026.
Cause: the refund window was counted from the day of dispatch, where REQ-012 says delivery.
Repair: inc-007-window-from-delivery (roadmap/unplanned/ until released, then roadmap/archive/)
Example added: REQ-012 satisfies/2. Given an order dispatched on 2 March and delivered on 4 March, when
the customer requests a refund on 2 April, then the request is accepted.
Proposed: INV-009 The refund window is counted from delivery, never from dispatch.
Environment: VE-002 could always set up an order whose dispatch and delivery days differ, but no check
used one: every order it set up was delivered on the day of dispatch. The repair adds late
delivery to its starting states, and checks that start from it.
The canon now has an invariant whose two checks have been seen to fail, and the verification environment covers a case it missed.
After every problem that reaches production, the team asks why the environment did not catch it, and the answer goes into the environment. Over time, this practice is expected to reduce back pressure.
Back to the start
The belt forms a loop, in which what Operate learns arrives at Collect as requests and at the express belt as repairs, while the next milestone is already being shaped. The statements people write to steer all of this work are described in the primitives.